Photo: CNN
Gauguin’s transparent train
–
–
It is planned that the train, 400 meters long, will consist of 14 wagons made entirely of glass.
French designer Thierry Gauguin unveiled the concept of the newest private train worth $ 350 million, reported CNN.
So, the project is being prepared for sale and is Gauguin’s first attempt to conceptualize a train. It is estimated that the construction will take about 2.5 years.
It is planned that the train, 400 meters long, will consist of 14 wagons made entirely of glass. In this case, if necessary, the vehicle will be able to switch from transparency to full opacity.
The train is designed for 18 passengers. They will have numerous rooms, a dining room, bedrooms, seating areas, terraces, and a garden with living plants. The train will be able to reach speeds of up to 160 kilometers per hour.
Recall in January in China experienced a magnetic levitation train, which can accelerate to 620 kilometers per hour.
A window fell out on a Ukrzaliznytsia train
News from Correspondent.net in Telegram. Subscribe to our channel https://t.me/korrespondentnet
– .