Saturday, May 30, 2020, 9:45 PM
–
–
It is the end of the Theemsweg route of the Port of Rotterdam Authority, a diversion of the port railway line at Rozenburg. An arch bridge has been placed over the A15 and N15 this Pentecost weekend.
–
After the installation was prepared on Friday, the bridge was placed on Saturday morning to the ‘parking lot’ at the crossing point of the A15. So on Saturday evening the bridge over the Thomassentunnel was lifted to its final location.
The Thomassentunnel is closed for traffic on Saturday evening between 6:00 PM and 11:00 PM. The Port of Rotterdam Authority shared images of the spectacular operation throughout the weekend.
After the weekend, the project must be finished.
–
– .
Related posts:
The three major U.S. stock indexes closed slightly higher, most of the large technology stocks rose
Eirgrid's Major Works to Cause Traffic Disruption in Dublin for Years Ahead
Get started with indie-hotels even in difficult times
Ernst Kuipers urges The Hague to accelerate: 'Give more people first shot' | Inland