Home » today » News » Black Forest/B31: Danger for motorists – boulders hang over the road

Black Forest/B31: Danger for motorists – boulders hang over the road


Boulder threatens to fall on the main road.

© Sachtleben Mining Services GmbH

  • conclude

  • Dominik Jahn

    conclude

A huge boulder threatens to fall on the road in the Black Forest. So the preparations for the demolition are going on.

In the Black Forest, motorists and the train are threatened with a heavy hazard. According to reports from Deutsche Bahn (DB), the route in Höllental between Hinterzarten and Himmelreich was closed. Also on the B31 federal road, according to information from echo24.de* still nothing more. And the security measures make perfect sense – the mega boulder has it all. A blast is planned.

As the German Press Agency (dpa) reports that car traffic between Freiburg and Titisee-Neustadt will be diverted: in the direction of Donaueschingen via Buchenbach, Spirzenstraße to Hinterzarten; in the other direction it goes via the B500 from St. Märgen to Buchenbach. As reported by the Freiburg police, “The route is already well used”. But there is no risk of traffic chaos.

Black Forest: Heavy motorist danger – boulders are only stuck on the tree

With its estimated 60 tons, the boulder is stuck on a slope above the railway line and the main road. The colossus is only held by a tree. Opposite of Baden newspaper an expert explained why such incidents are not entirely unexpected.

The B31 federal road will remain closed for the time being.

© Philipp von Ditfurth

Engineering geologist Clemens Ruch from the State Mining Authority shows that a rock is penetrated “of clefts and crevices”. Then just walk into this “Rainwater and tree roots worked their way in”. In winter, ice forms in the crevasses, leading to the loosening of the rock structure. The current season is just that “typical rock fall season”.

Mega boulder in the Black Forest is to be blown up: planning is underway

The heavy danger for motorists should now simply be blasted away! Plans are currently underway for a controlled demolition of the mega boulder. At first it was Wednesday. At the request of echo24.de Deutsche Bahn confirms the date for Friday. However, the demolition master could not give an exact time.

A report by SWR As a result, “holes were drilled into the rock in which the explosives for the blasting are to be placed” on Wednesday.

Closure of the railway line between Hinterzarten and Himmelreich: buses used as a replacement

Due to the temporary closure of the railway line between Hinterzarten and Himmelreich, Deutsche Bahn has deployed buses for the affected section. The DB further explains: “The trains of the lines S1, S10 and S11 run in the sections Breisach/Endingen am Kaiserstuhl-Freiburg (Breisgau) Hauptbahnhof-Himmelreich and Titisee-Seebrugg/Villingen. In the Himmelreich-Hinterzarten-Titisee line section, Deutsche Bahn uses buses.

It also says about the duration of the route failure: “According to the current status, the route will probably remain closed up to and including Saturday, March 19th.” *echo24.de is an offer from IPPEN.MEDIA.

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.