Home » today » Business » The Cibitung-Cilincing Toll Road is Almost Complete, Cikarang Bablas to Tanjung Priok

The Cibitung-Cilincing Toll Road is Almost Complete, Cikarang Bablas to Tanjung Priok

Jakarta

Cibitung-Cilincing Toll Road 34.76 km long will be fully connected and 3 sections will be operational. The toll road that connects the industrial area in Cikarang with Tanjung Priok Port has a total of 4 sections.

The first section that has been operational is Section 1 of the 3.03 km SS Cibitung-Telaga Asih section which has been operating for 2.65 km since 2021.

Furthermore, Sections 2 and 3 of the 24.45 km long Asih-Tarumajaya Lake which was inaugurated by President Joko Widodo. Then for Section 4 of the Tarumajaya-Cilincing section (7.52 km) it is in the final stages of construction completion, which has reached 98% progress.

Launching from the BPJT website, Tuesday (17/1/2023), the JORR 2 Toll Road network that is connected to the Cibitung-Cilincing Toll Road consists of:

– The Cengkareng-Batu Ceper-Kunciran Toll Road (14 km) is already operational
– Kunciran-Serpong Toll Road (11 km) is already operational
– The Serpong-Cinere Toll Road (10.14 km) has been completely constructed and is ready for operation.
– Cinere-Jagorawi Toll Road (14.6 km) which is currently in the stage of completing the construction of Sections 3A & 3B (Kukusan-Limo)
– Cimanggis-Cibitung Toll Road (26.18 Km) which is currently in the stage of completing the construction of Sections 2A & 2B (Jatikarya-Cibitung).

The toll road, which is part of the Jakarta Outer Ring Road (JORR 2) Toll Network, is expected to provide support for smooth mobility, commuter movements and logistics, especially towards the Cibitung and Cilincing industrial areas.

Road presence Cibitung-Cilincing Toll Road and later will have a rest area and logistics hub (logistics activities) which have complete rest area facilities and are supported by container warehousing, container workshops, container washing, modern warehouse, and car and truck parking.

The Cibitung-Cilincing Toll Road which is managed by the Toll Road Business Entity (BUJT) PT Cibitung Tanjung Priok Port Tollways was built with an investment cost of IDR 12.91 trillion and will also be directly connected to other toll road sections, namely the Jakarta-Cikampek Toll Road and reduce traffic congestion. traffic of vehicles heading to the Bekasi area and its surroundings.

Watch VideoJokowi Inaugurates Cibitung-Cilincing Toll Road: Accelerates Mobility of Goods
[Gambas:Video 20detik]
(zlf/zlf)

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.