The state building office later plans to use the well as a groundwater measuring point to monitor the Hesslar drinking water well.
– South of Heßlar, halfway between the former sewage treatment plant and Thüngen, an approximately 70 meter deep borehole is being created. It is created by the company “iBEG” from Mühlhausen in Thuringia.
Photo: Ernst Schneider
–
Photo: Ernst Schneider
-
Hesslar
-
Ernst Schneider
-
Building authorities
-
Soil
-
construction sites
-
Holes
-
Geotechnical engineering
-
Engineering firms
-
Würzburg western bypass
![Loading Loading](https://i0.wp.com/www.mainpost.de/storage/sym/loaders/loader_small_grey.gif?w=900&ssl=1)
–
–