Home » today » News » Replacement rail traffic on the Breisgau S-Bahn due to construction work

Replacement rail traffic on the Breisgau S-Bahn due to construction work


Several level crossings are also blocked

The Breisgau S-Bahn will be closed from June 6th to 10th due to routine work. In addition, a switch will be installed at Freiburg Central Station. A replacement rail service is set up for all rail travelers.

In order to keep the restrictions for passengers as low as possible, a rail replacement service (SEV) has been set up between Freiburg and Breisach. Since Gottenheim station is also not accessible for train traffic from the direction of Endingen, a bus service was also set up there, which includes Bötzingen station in the SEV between Breisach and Freiburg. The SWEG trains running between Endingen and Gottenheim / Freiburg on Sunday (June 7th, 2020) will also be replaced by buses in the Bötzingen-Gottenheim / Freiburg section.

The following level crossings are also blocked:

  • Buchheimerstrasse (June 5 – June 7, 2020)
  • Hugstetten station (05.06 – 07.06.2020)
  • Forest kindergarten (June 5 – June 9, 2020)
  • In the Wolfswinkel (06.06. -08.06.2020)
  • In Christ (06.06. – 08.06.2020)
  • Landwasser stop (06.06. – 09.06.2020)
  • Königsbergerstrasse (June 8 – June 11, 2020)

At times, the level crossings in Gottenheim on “Bötzinger Straße”, in Wasenweiler on “Wirtschaftsweg” and on “Merdingerstraße” as well as in Ihringen on “Gündlingerstraße / Eisenbahnstraße” and on “Keltenweg / Am Krebsbach” are blocked.

The Breisgau S-Bahn is scheduled to run again on June 10th.

(dk)

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.