Home » today » Business » Exciting New Day Care Center Being Built in Heuchling – Mayor Thomas Lang Announces Expansion in Childcare Services

Exciting New Day Care Center Being Built in Heuchling – Mayor Thomas Lang Announces Expansion in Childcare Services

HEUCHLING – In Heuchling, a day care center with five groups for up to 98 children is being built next to the local primary school. In the City Council meeting on April 25, 2024 Laufer town council unanimously recognized the need for 24 crèche places, 56 kindergarten places and 18 places for a child’s group. This includes a total of seven combined locations. The group of children under the age of three can have eight places and ten places for children older than three years.

The A new two-story, unobstructed building A wooden construction will be built on part of the Heuchling elementary school. Work is expected to resume Start on May 21, until mid-2026 the building should be completed. The children and their teachers then have more than 1000 square meters of space that can be used.

The building will be heated with a heat pump, the roof will be locked and equipped with a photovoltaic system.

When designing the facility, as it is called a relatively open concept track A group room and other group rooms were divided into several so-called laboratories for children 8 to 15. Children can freely choose how to use them according to their needs. The children are divided into main groups and at the same time they can distribute themselves to different areas of the day care center according to their interests and needs. The spatial concept corresponds to the principle of what is called Workshop pedagogy. Classic activity areas are offered such as construction and construction, design and operation, role play, movement, research and experimentation, reading and writing, relaxation, board games and puzzles. In addition, the children will find a dining room and a cooking workshop as well as a water workshop in the sanitary area.

Intakes live in the day care center, where they are it is open to all children. The facility pays special attention to children with disabilities (in the near future) so that they can participate equally in social life. Among other things, the facility was designed to be barrier-free.
The garden offers a sheltered place for the creche children. Children can meet in the whole garden.

There is a concept Workshop pedagogy also reflected in the design of the outdoor space. This includes an outdoor workshop for multifunctional use, for example for creative or research activities, a nursery with raised beds and a terrace for the outdoor dining area.
The children also have opportunities to climb, hide, swing, play in the sand, play in the mud, role play, run around and relax.

die new daycare center it is expected in Herb 2026 replace the day care center on Heuchlinger Bergfriedstrasse. There will be 20 extra kindergarten places and 14 extra crèche places in the new facility. The sponsor will remain ASB Wunderkinder gGmbH.
The building is expected to be around 6.1 million euros cost. The funding amount has not yet been determined.

“The day care center in Heuchling is badly needed to be built, because the need for day care places is increasing. As a city, we spend a lot of money to provide exceptional facilities for our children. “We are investing in the future of the town of Lauf,” we say Mayor Thomas Lang.

Source: City of Lauf

2024-05-05 13:02:28
#day #care #center #Heuchling #children #NLAND

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.