Home » today » News » Emergency Dam Construction in Maastricht: Defense Chinook Helicopters Lower Nets of Stones onto Broken Dam

Emergency Dam Construction in Maastricht: Defense Chinook Helicopters Lower Nets of Stones onto Broken Dam

Jan 6, 2024 at 11:09 AM Update: 24 minutes ago

Two Defense Chinook helicopters lowered the first nets full of stones onto a broken dam on the Stuwweg in Maastricht on Saturday morning. This should reduce the flow rate of the water and retain as much water as possible.

Further on, a contractor and Defense are working on the construction of an emergency dam. Large equipment is used for this. The contractor has started pouring stone from one bank, Rijkswaterstaat said.

The emergency dam should make the repair of the broken spillway dam easier.

Due to strong currents, the 120-meter-wide spillway collapsed over a width of 50 meters on Wednesday. This caused a rapid that caused a houseboat to become loose and crash into a bridge. As a result, the bridge was so damaged that it is unsafe to use.

Photo: Rijkswaterstaat Unfortunately, this content cannot be shown. We do not have permission for the necessary cookies. Please accept cookies to view this content.

Change cookie settings

0:49Play button

Hole in the Maastricht dike is being closed with an enormous amount of stones

Image: ANP

Read more about:

MaastrichtHoogwater
2024-01-06 10:09:00


#Defense #helicopters #drop #heavy #stones #broken #spillway #dam #Maastricht #Domestic

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.