Freiburg: From June 30th: Footpath between bike station and VAG stop as well as elevator on platform 8 at Freiburg main station blocked – work in the course of the renovation of the Stadtbahn bridge will be carried out

From Tuesday, June 30th, the new bridge railings will be installed along the southern bridge walkway (on the Stühlinger Kirchplatz side) between the VAG stops at Eschholzstrasse and the main train station. The footpath between the bike station and the VAG main station stop will be blocked until Tuesday, July 7th. The elevator at platform … Read more