Skip to main content
World Today News
  • Home
  • News
  • World
  • Sport
  • Entertainment
  • Business
  • Health
  • Technology
Menu
  • Home
  • News
  • World
  • Sport
  • Entertainment
  • Business
  • Health
  • Technology
East Coast Cluster Delivery Partners Award £2.25bn in Supply Chain Contracts

East Coast Cluster Delivery Partners Award £2.25bn in Supply Chain Contracts

November 23, 2026 World Desk World

Delivery partners for the UK’s East Coast Cluster have awarded more than £2.25 billion in supply chain contracts to domestic businesses.

These awards span over 350 individual contract placements as construction on the carbon capture network progresses across Teesside.

Minister for Local Energy and Jobs Martin McCluskey MP and Redcar MP Anna Turley visited the Teesworks site on Saturday to mark the milestone. The East Coast Cluster project includes the Northern Endurance Partnership (NEP), which is building the onshore and offshore CO2 transport and storage network, alongside Net Zero Teesside Power (NZT Power).

The cluster is designed to create and sustain more than 3,000 jobs. UK businesses have fulfilled over half of the total supply chain content across engineering, manufacturing, construction, and technical services.

NEP Managing Director Rich Denny confirmed the transport and storage network has surpassed 45% delivery. This progress has allowed major contract packages for regional providers, including Corinth Pipeworks UK in Hartlepool, which supplied 105 kilometers of linepipe.

Teesside-based pX Group also secured a contract to manage both the NZT Power and NEP facilities from commissioning through commercial operations. This agreement involves recruiting approximately 100 local personnel and five apprentices. Meanwhile, Thirsk-based Potter Plant Hire has added 74 jobs to the project since June 2025, with 70 of those staff recruited within a 13-mile radius of the site.

Once operational, NZT Power is engineered to capture up to 2 million metric tons of CO2 annually. This carbon will be transported through the NEP subsea trunkline to the Endurance aquifer beneath the North Sea, which is designed to scale toward 10 million metric tons of regional industrial storage capacity per year.

Net Zero Teesside Power is a joint venture between bp and Equinor, designed as one of the world’s first commercial-scale gas-fired power stations equipped with carbon capture. Capable of generating up to 860 megawatts of dispatchable, low-carbon electricity, the facility serves as a foundational component of the East Coast Cluster.

By integrating with the Northern Endurance Partnership—a joint venture between bp, Equinor, and TotalEnergies—the station will supply captured CO2 to a gathering network. This infrastructure connects the plant to the broader East Coast Cluster, which was selected by the government in March 2023 to facilitate the transport and secure subsea storage of approximately 4 million tonnes of CO2 per year starting in 2027.

Share this:

  • Share on Facebook (Opens in new window) Facebook
  • Share on X (Opens in new window) X

More on this

  • Lowy Index: China-US Military Gap Narrowest on Record, PLA Fleet 35% Larger
  • Ukraine Strikes Russian Warship in Libya, Claims Sinking of Corvette Merkury

Related

Europe, uk

Search:

World Today News

World Today News is your trusted source for global journalism — breaking headlines, in-depth analysis, and reporting from around the world.

Quick Links

  • Privacy Policy
  • About Us
  • Accessibility statement
  • California Privacy Notice (CCPA/CPRA)
  • Contact
  • Cookie Policy
  • Disclaimer
  • DMCA Policy
  • Do not sell my info
  • EDITORIAL TEAM
  • Terms & Conditions

Browse by Location

  • GB
  • NZ
  • US

Connect With Us

© 2026 World Today News. All rights reserved. Your trusted global news source directory.
For contact, advertising, copyright, issues email: [email protected]

Privacy Policy Terms of Service