Slovakia Plans Longest Road Tunnel to Divert Transit Trucks From Bratislava
The Karpaty tunnel is set to become the longest road tunnel in Slovakia, spanning approximately 11.8 kilometers as part of the D4 highway project near Bratislava.
The National Highway Company (NDS) released an animation on Monday detailing the technical design for the route, which aims to connect the D1 and D2 highways on the left bank of the Danube.
The project is designed to divert transit traffic, specifically heavy goods vehicles, away from the capital’s internal infrastructure. According to Topky, projections indicate the tunnel could remove up to 40 percent of transit trucks from Bratislava’s existing highways.
| Feature | Specification |
|---|---|
| Total Tunnel Length | 11.8 kilometers |
| D4 Segment Length | 12.4 kilometers |
| TBM Head Diameter | 12.5 meters |
| Vehicle Clearance Height | 4.8 meters |
Engineers plan to use tunnel boring machine (TBM) technology with a 12.5-meter diameter head to excavate the mass, tnlive.sk reported. The construction will involve passing through four distinct geological environments, ranging from granite and metamorphic rocks to shales and limestones, with nearly three kilometers passing through sandy soils, according to kanal1.sk.
Before excavation begins, crews must prepare a construction pit, reinforcing slopes with shotcrete, steel mesh, and steel nails, tnlive.sk noted. Once the tunnel is bored, it will feature a double-layered lining, with the inner layer incorporating a waterproof membrane.
The design includes two lanes in each direction, each four meters wide, flanked by one-meter sidewalks.
The state is currently investing millions of euros into a detailed geological and hydrogeological survey involving the drilling of 170 boreholes, HNonline reported.
While the project is intended to streamline travel between the east and west, financing for the estimated 1.5 billion euro construction remains unfinalized, according to kanal1.sk.
“This lining ensures the immediate watertightness of the structure and eliminates the drainage effect of the tunnel,” the National Highway Company said.