Skip to main content
World Today News
  • Home
  • News
  • World
  • Sport
  • Entertainment
  • Business
  • Health
  • Technology
Menu
  • Home
  • News
  • World
  • Sport
  • Entertainment
  • Business
  • Health
  • Technology

Public Hearing Scheduled for Proposed Monument Hill Switchyard Near Quincy, Washington

November 27, 2026 Newsroom News

The Grant County PUD has scheduled a virtual public hearing for December 8, 2026, at 1:30 PM to review a Conditional Use Permit application for the proposed Monument Hill Switchyard near Quincy, Washington.

Switchyard Project Details

The Grant County PUD plans to build a 230 kV switchyard spanning approximately 12 acres on an 88-acre parcel, according to legal notices. The site sits east of the existing Quincy Foothills Substation at 3301 NE M St.

Construction will support the Quincy Transmission Expansion Plan. Workers will use an existing gravel road to access the property and remove crops, grasses, and grain within the switchyard footprint and staging areas.

Project improvements require about 13,520 cubic yards of excavation and 74,710 cubic yards of fill. The site will feature concrete foundations, a control house, electrical bus systems, circuit breakers and switches, capacitor banks, grounding and conduit systems, communication and relay equipment, and perimeter fencing up to 8 feet tall.

Hearing Examiner Evaluates Use Permit Water Rights

Conditional Use Permits undergo evaluation by the Hearing Examiner in accordance with Quincy Municipal Code Chapter 20.52. City staff member Liam Taylor handles inquiries regarding the switchyard proposal.

Frontier Legacy Trust and King Legacy Trust submitted a water right change application on June 10, 2024, seeking to transfer a groundwater certificate place of use. Protesters must submit their objections alongside a fifty-dollar fee to the Department of Ecology within thirty days following December 4, 2026.

Hearing and Environmental Review

Larry Lehman of the Grant County PUD serves as the project applicant. The proposal requires a Conditional Use Permit in the General Industrial zoning district under Quincy Municipal Code Section 20.04.010.

A Hearing Examiner will review the application to approve it with or without conditions, or deny it during the public hearing.

Members of the public can participate virtually via Zoom using meeting ID 827 8905 1533 and passcode 996573.

The Grant County PUD has already processed and issued a Determination of NonSignificance for the project acting as its own lead agency. Following construction, vegetation inside the switchyard and entrance apron will not be replanted, but the PUD will periodically treat perimeter vegetation to control noxious weeds.

Share this:

  • Share on Facebook (Opens in new window) Facebook
  • Share on X (Opens in new window) X

Worth a look

  • 3 Bedroom Vintage Colonial for Rent in Springfield MA with Off-Street Parking
  • Poisonous Cane Toad Captured in Tauranga After Volunteer Firefighter Spots Hitchhiker
  • Indonesia Prepares Trade Talks With US Over Proposed Tariffs (time.news)

Related

Search:

World Today News

World Today News is your trusted source for global journalism — breaking headlines, in-depth analysis, and reporting from around the world.

Quick Links

  • Privacy Policy
  • About Us
  • Accessibility statement
  • California Privacy Notice (CCPA/CPRA)
  • Contact
  • Cookie Policy
  • Disclaimer
  • DMCA Policy
  • Do not sell my info
  • EDITORIAL TEAM
  • Terms & Conditions

Browse by Location

  • GB
  • NZ
  • US

Connect With Us

© 2026 World Today News. All rights reserved. Your trusted global news source directory.
For contact, advertising, copyright, issues email: [email protected]

Privacy Policy Terms of Service