Skip to main content
World Today News
  • Home
  • News
  • World
  • Sport
  • Entertainment
  • Business
  • Health
  • Technology
Menu
  • Home
  • News
  • World
  • Sport
  • Entertainment
  • Business
  • Health
  • Technology
Latvia Allocates €107,621 to Ventspils, Talsi Municipalities for July Flood Damage

Latvia Allocates €107,621 to Ventspils, Talsi Municipalities for July Flood Damage

November 24, 2026 Newsroom News

The Cabinet approved 107,621 euros from the state budget’s contingency fund on Tuesday for Ventspils and Talsi municipalities to cover flood damage from July 20 and 21, LV portāls reported.

The funds target municipal infrastructure repairs and partial compensation for crisis payments Talsi municipality made to four residents. Ventspils municipality receives 40,429 euros for four local roads in Pope and Puze parishes, where flooding damaged road surfaces, culverts and ditches. Total repair costs there reach 57,756 euros, with the municipality covering 30 percent, or 17,327 euros.

Talsi municipality receives 67,192 euros. The sum covers repairs to 49 municipal roads, temporary protection for the Dursupe mill pond dam, and 2,000 euros — half the 4,000 euros the municipality paid to four residents in crisis aid. Road and dam repairs total 93,132 euros, with the municipality’s 30 percent share at 27,940 euros.

“July’s powerful downpours caused flooding in both Ventspils and Talsi municipalities,” Edgars Tavars said.

“State support will help municipalities cover road and other infrastructure restoration costs, as well as partially compensate Talsi municipality residents for crisis payments. One must say there is no evil without good, for example, the Dursupe will be even more beautiful after restoration than before.”

The July 20-21 storms dropped 78.3 millimeters of rain at the Ventspils observation station and 73.9 millimeters at Stende, according to the Latvian Environment, Geology and Meteorology Centre.

Separately, the government allocated 577,759 euros on September 22 to the Transport Ministry for state road repairs in the same municipalities, LSM reported. The funding addresses washouts, damaged culverts and other hazards on state roads, including the P128 Sloka–Talsi highway, where a closed section required a temporary bypass. State joint-stock company “Latvian State Roads” estimated those repairs at 577,759 euros.

On 24 November, the Cabinet approved a VARAM proposal to allocate 107,621 euros from the state budget’s contingency program to Ventspils and Talsi municipalities.

In August, Talsi municipality began building a temporary bypass for the washed-out section of the Sloka–Talsi regional road, with all damage repairs planned for completion by year-end, according to Lsm.

Share this:

  • Share on Facebook (Opens in new window) Facebook
  • Share on X (Opens in new window) X

Keep reading

  • Providence Erases Deficit, Beats VCU 72-66 in OT to Open Maui Invitational
  • Oviedo Researchers Link Sudarium to Shroud in Burial Study
  • Latvia to Start 2027 Under Provisional Budget, Finance Ministry Says (time.news)

Related

Search:

World Today News

World Today News is your trusted source for global journalism — breaking headlines, in-depth analysis, and reporting from around the world.

Quick Links

  • Privacy Policy
  • About Us
  • Accessibility statement
  • California Privacy Notice (CCPA/CPRA)
  • Contact
  • Cookie Policy
  • Disclaimer
  • DMCA Policy
  • Do not sell my info
  • EDITORIAL TEAM
  • Terms & Conditions

Browse by Location

  • GB
  • NZ
  • US

Connect With Us

© 2026 World Today News. All rights reserved. Your trusted global news source directory.
For contact, advertising, copyright, issues email: [email protected]

Privacy Policy Terms of Service