Skip to main content
World Today News
  • Home
  • News
  • World
  • Sport
  • Entertainment
  • Business
  • Health
  • Technology
Menu
  • Home
  • News
  • World
  • Sport
  • Entertainment
  • Business
  • Health
  • Technology
LADWP Secures $28 Million Federal Grant for Groundwater Replenishment Project

LADWP Secures $28 Million Federal Grant for Groundwater Replenishment Project

November 26, 2026 Newsroom News

The Los Angeles Department of Water and Power has secured an additional $28 million in federal funding for the Los Angeles Groundwater Replenishment Project. Awarded by the U.S. Bureau of Reclamation, this grant brings total federal support for the $1 billion water recycling initiative to $88 million.

Federal Funding Expansion

The department announced the funding on November 23, noting that the grant will support ongoing construction at the Donald C. Tillman Water Reclamation Plant in the San Fernando Valley, according to ladwpnews.com.

This latest award builds upon a previous $60 million in funding from the Bureau of Reclamation, as reported by publicpower.org. The Bureau of Reclamation initially selected the project for a $30 million award in May 2024, a figure that counts toward the total previously reported by the utility, infraday.com noted.

Project Supply Serves Five Hundred Thousand Residents

Once fully operational, the project is designed to produce up to 45 million gallons of purified recycled water daily. This local supply is intended to replenish the San Fernando Groundwater Basin and provide enough water to serve approximately 500,000 residents, according to goldencoastjournal.com.

“The decisions we make today will shape Los Angeles for generations to come. That’s why investment in climate-resilient projects like this is more important than ever,” said Los Angeles Mayor Karen Bass, as reported by ladwpnews.com.

The facility utilizes a multi-step purification process, including membrane filtration, reverse osmosis, and ultraviolet light with advanced oxidation, according to infraday.com. Jacobs is the design-build partner for the infrastructure, which aims to diversify the city’s water portfolio due to climate challenges.

Wastewater treatment basins at the Donald C. Tillman Water Reclamation Plant in Van Nuys
Photo: goldencoastjournal.com

Project Design and Recognition

The facility will add a purification process to the existing Tillman plant, treating wastewater through membrane filtration, reverse osmosis, and ultraviolet light with advanced oxidation. Jacobs serves as the design-build partner, whose expertise helped secure the latest federal funding.

Tanks Manage Flow Purify Water Pump Hansen Spreading Grounds

Two equalization tanks, each holding 4.6 million gallons, help manage daily flow variations. The purification process includes membrane filtration to remove particles, reverse osmosis to separate dissolved substances, and ultraviolet light with advanced oxidation to break down remaining compounds.

Once purified, the water will be pumped through an existing pipeline to the Hansen Spreading Grounds in the San Fernando Basin.

The San Fernando Groundwater Basin provides an average of 12% of Los Angeles’ water supply, rising to 23% during extended dry periods when imported water is scarce. Contamination has historically affected nearly 50% of LADWP’s groundwater wells, limiting its use, but remediation efforts are underway to restore this critical resource as a local supply.

Infrastructure Construction Timeline

Construction at the Tillman plant began in December 2024, and the project is scheduled to be completed by the end of 2027, infraday.com reported. The utility said that federal investment helps offset total project costs, though it has not provided a specific estimate regarding the potential impact on customer water rates. “The Los Angeles Groundwater Replenishment Project is one of the most important investments in our region’s water future,” said David W. Hanson, Interim General Manager of LADWP.

“This additional federal investment reflects strong confidence in the project’s value and will help us continue building a more reliable, resilient, and diversified water portfolio for Los Angeles.”

“Using advanced purified recycled water to ensure a sustainable water supply in Los Angeles will benefit our communities, both now and for future generations,” said Joone Kim-Lopez, LASAN Executive Director and General Manager, as quoted by ladwpnews.com.

Share this:

  • Share on Facebook (Opens in new window) Facebook
  • Share on X (Opens in new window) X

Worth a look

  • Eurozone Leaders Approved De Cos to ECB Board but Failed Budget Deal
  • Cora Returns Home, Secrets Revealed in Blade Runner 2099 Episode 6

Related

Search:

World Today News

World Today News is your trusted source for global journalism — breaking headlines, in-depth analysis, and reporting from around the world.

Quick Links

  • Privacy Policy
  • About Us
  • Accessibility statement
  • California Privacy Notice (CCPA/CPRA)
  • Contact
  • Cookie Policy
  • Disclaimer
  • DMCA Policy
  • Do not sell my info
  • EDITORIAL TEAM
  • Terms & Conditions

Browse by Location

  • GB
  • NZ
  • US

Connect With Us

© 2026 World Today News. All rights reserved. Your trusted global news source directory.
For contact, advertising, copyright, issues email: [email protected]

Privacy Policy Terms of Service