Skip to main content
World Today News
  • Home
  • News
  • World
  • Sport
  • Entertainment
  • Business
  • Health
  • Technology
Menu
  • Home
  • News
  • World
  • Sport
  • Entertainment
  • Business
  • Health
  • Technology
Former Minister: A0-A3 Interchange Inflated to 208 Hectares

Former Minister: A0-A3 Interchange Inflated to 208 Hectares

November 23, 2026 Entertainment Desk Entertainment

Romania’s A0–A3 interchange near Bucharest covers 208 hectares — seven times the size of Germany’s busiest junction, Frankfurt’s Frankfurter Kreuz — despite handling one-tenth the traffic, former Transport Minister Cătălin Drulă said Sunday, according to Hotnews.

  • Interchange expanded from 82 to 208 hectares, adding 126 hectares of mostly agricultural land.
  • Expropriation costs rose by 61 million lei, with 109 hectares paid at urban rates of 95 lei/sq m versus 11 lei/sq m rural.
  • Largest payout of 7.57 million lei went to Liptra International, formerly administered by Ilfov County Council President Hubert Thuma.
  • CNAIR Director Cristian Pistol oversaw the expansion decision and remains in post, Drulă alleges.

The Frankfurter Kreuz spans roughly 30 hectares and carries 300,000 vehicles daily. The A0–A3 node, by contrast, sees an estimated 30,000 vehicles per day, Drulă wrote on Facebook, citing the feasibility study and current design parameters. HotNews reported the comparison Sunday.

“Engineers never reach 200 hectares on technical criteria,” Drulă wrote. “The node was inflated until it encompassed all the land it had to encompass.”

Drulă, who serves as vice-president of the Chamber of Deputies, wrote that the existing cloverleaf design was sufficient for the location. He added that if more capacity were needed on certain routes, better technical solutions exist, such as semi-direct ramps with an additional bridge over the motorway on high-traffic relations, or grade-separated loops between ramps while keeping the cloverleaf form, as used at the Frankfurter Kreuz.

Photo: agerpres.ro

Total ramp length grew to 13.7 kilometers from 7.6 kilometers in the feasibility study. Drivers switching highways lose 10 seconds on average; on the busiest Ploiești–A2 route, the detour adds 50 seconds and 1.5 kilometers, Agerpres reported Sunday.

Two direct ramps of 2.5 kilometers each have only a single lane. “A broken-down truck on such a ramp will block traffic,” Drulă wrote. Long ramps require two lanes or an emergency lane, or must be kept much shorter, he added.

Drulă alleged that CNAIR Director Cristian Pistol, who oversaw the expansion decision and remains in post, is backed by Thuma and former Prime Minister Sorin Grindeanu, adding: “For them, shoe boxes matter, not the public interest.”

Two direct ramps of 2.5 kilometres each have only a single lane, creating a safety hazard, Drulă said.

Photo: stirileprotv.ro

“On technical criteria, engineers never reach 200 hectares,” he wrote. “The node was inflated until it encompassed all the land it had to encompass.”

Of the extra 126 hectares expropriated, 109 hectares of arable land and pasture “in the open field” were compensated at 95 lei per square meter — the urban rate — rather than the 11 lei per square meter rural rate, Știrile ProTV reported Sunday.

The single largest compensation, 7.57 million lei, went to Liptra International, where Hubert Thuma, president of the Ilfov County Council, previously served as administrator. Thuma and former Prime Minister Sorin Grindeanu back CNAIR Director Cristian Pistol, who held the post when the expansion was approved and remains in place, Drulă alleged, according to Agerpres.

Drulă served as Minister of Transport in the Cîțu Cabinet from 23 December 2020 until his resignation on 7 September 2021, the period when the interchange expansion was approved. Since February 2022 he has held the vice-presidency of the Chamber of Deputies, the lower house of Parliament, giving him institutional oversight of the transport infrastructure portfolio he once led.

“For them, shoe boxes matter, not the public interest,” Drulă wrote, referring to the PSD party.

Share this:

  • Share on Facebook (Opens in new window) Facebook
  • Share on X (Opens in new window) X

Worth a look

  • Young Authors in Alexandra Township Launch Anthology via Read Alex
  • Review: Laika’s ‘Wildwood’ Stop-Motion Epic — 1,155 Days, 132 Minutes

Related

Search:

World Today News

World Today News is your trusted source for global journalism — breaking headlines, in-depth analysis, and reporting from around the world.

Quick Links

  • Privacy Policy
  • About Us
  • Accessibility statement
  • California Privacy Notice (CCPA/CPRA)
  • Contact
  • Cookie Policy
  • Disclaimer
  • DMCA Policy
  • Do not sell my info
  • EDITORIAL TEAM
  • Terms & Conditions

Browse by Location

  • GB
  • NZ
  • US

Connect With Us

© 2026 World Today News. All rights reserved. Your trusted global news source directory.
For contact, advertising, copyright, issues email: [email protected]

Privacy Policy Terms of Service