Skip to main content
World Today News
  • Home
  • News
  • World
  • Sport
  • Entertainment
  • Business
  • Health
  • Technology
Menu
  • Home
  • News
  • World
  • Sport
  • Entertainment
  • Business
  • Health
  • Technology
EUDAMED UDI Device Registration Deadlines for Korean Manufacturers 2026 and 2027

EUDAMED UDI Device Registration Deadlines for Korean Manufacturers 2026 and 2027

November 28, 2026 Health Desk Health

On November 28, 2026, a key deadline for South Korean medical device manufacturers to register existing products in the EU’s EUDAMED system takes effect, with a separate May 28, 2027, deadline for notified bodies to register certificates. This date determines which existing devices require registration in the EU's EUDAMED database under a transitional framework established by European Union regulations. The legal basis for this phased approach is Regulation (EU) 2024/1860, which amended the Medical Device Regulation (MDR, Regulation (EU) 2017/745) and the In Vitro Diagnostic Regulation (IVDR). The regulation allows for the mandatory application of EUDAMED modules as they become functionally verified, rather than waiting for all six to be complete. This framework was put into motion by the European Commission's Decision (EU) 2025/2371, published in the Official Journal on November 27, 2025. This decision officially declared four EUDAMED systems met functional requirements, starting a six-month transition period. According to the European Commission's EUDAMED preparation guidance page, the transition period ended on May 28, 2026, making the use of four modules mandatory. These modules are Economic Operator Registration (Actor Registration), UDI/Device Registration, Notified Bodies & Certificates, and Market Surveillance, according to 코리아메드 글로벌. A key point for manufacturers is that these four modules are interconnected. A Single Registration Number (SRN) from the Actor Registration module is required to proceed with device registration, and the registration of notified bodies' certificates affects the scope of data in the public database. The remaining two modules—Clinical Investigation/Performance Studies and Vigilance/Post-Market Surveillance—are still under development and not currently mandatory. Confusion in practice can arise when manufacturers mistakenly believe all six modules are mandatory at once or miss the deadlines for the core four modules. Scope of the November 28 Deadline

A common misconception is that November 28, 2026, is a universal deadline for all medical devices on the EU market. However, the requirement applies only to products that were first placed on the market before May 28, 2026, and continue to be supplied afterward. The rules differ based on a product's initial market entry date and its continued supply status. For devices first placed on the market before May 28, 2026, and with continued supply after that date, the November 28 deadline for registration in EUDAMED applies. This includes not only devices compliant with the MDR/IVDR but also legacy devices from previous directives that are still being lawfully supplied. If a South Korean manufacturer has been exporting a product to Europe for years, but new production or additional shipments reach the EU market after May 28, 2026, that product's UDI-Device Identifier (UDI-DI) must be registered by November 28. Conversely, devices first placed on the market on or after May 28, 2026, are not eligible for the November 28 transitional period. For these new devices, the requirement is to register in EUDAMED before they are placed on the market, according to the transition period device and certificate registration schedule and the EUDAMED phased introduction Q&A document. A mistake in classifying a new product as eligible for the deadline could result in non-compliance from its first day on the market. Based on Regulation (EU) 2024/1860 and the transition schedule, notified bodies have until May 28, 2027, to register existing MDR/IVDR certificates in EUDAMED. Practical Distinctions: Registration Units and "Placing on the Market"

Two key concepts determine a product's registration status: the unit of registration and the legal definition of "placing on the market." Registration in EUDAMED is not done per serial or lot number but per UDI-DI, which identifies a product model. A single UDI-DI covers all units of that model.

The critical legal concept is “placing on the market,” defined by the MDR as “the first making available of a device on the Union market.” This is different from the subsequent distribution of already-placed stock. For a product that was last shipped to an EU importer before May 28, 2026, and has had no new shipments since, its continued sale within Europe is not a new “placing on the market.” However, if even a single unit of a product model is shipped to the EU after May 28, 2026, that UDI-DI is considered as having a continued market presence and must be registered by November 28.

South Korean manufacturers should examine shipping records and import logs to determine the exact point of first supply to the EU market, as factors Incoterms or third-party logistics can make this date ambiguous.

Exemptions and Post-Market Obligations

Not all legacy products require separate registration. If the same device is already registered in EUDAMED as an MDR/IVDR-compliant product, the legacy version is generally exempt from duplicate registration. However, this exemption is strictly conditional. Any changes to the product design, specifications, or labeling that necessitate a new UDI-DI void this exemption. Companies should document product change histories and identifier mapping for safety reporting purposes.

Devices that are no longer supplied to the EU after May 28, 2026, are not subject to the November 28 registration requirement. However, a crucial exception exists. If safety issues arise requiring Post-Market Surveillance (PMS) or Field Safety Corrective Actions (FSCA) via EUDAMED, a separate registration may be triggered. Even discontinued products must have their technical documentation and UDI information readily available to meet these potential future obligations.

Prerequisite for Manufacturers: SRN and Authorized Representative

Before a manufacturer can register a device, it must obtain a Single Registration Number (SRN) through the Economic Operator Registration module.

For manufacturers outside the EU, like those in South Korea, this requires appointing an EU Authorized Representative. The process involves the manufacturer submitting company and representative information along with a mandate summary to EUDAMED. The representative then verifies the information, and the relevant Competent Authority validates it, leading to SRN issuance. Delays can occur if information on certificates or contracts does not match, so managing this lead time is crucial.

Public Database Timelag

Even if a manufacturer successfully registers a device by November 28, 2026, it may not immediately appear in the public EUDAMED database. The transition period device and certificate registration schedule and the European Commission’s guidance state that for high-risk devices or those requiring notified body involvement, the device may not be public until the associated certificate is registered by the notified body.

Since the deadline for notifying bodies to register certificates is May 28, 2027, a timelag can occur. Manufacturers should be prepared to provide system evidence of registration to European buyers or tender committees who cannot yet see the product in the public database.

Recommended Internal Registration Ledger

To manage compliance, South Korean manufacturers should establish an internal registration ledger. This ledger should include:
– Verification of the company’s EU Authorized Representative status and SRN.
– A complete list of all exported model UDI-DIs and legacy identifiers, classified by whether they are MDR/IVDR or legacy devices.
– Determination of each UDI-DI’s first EU market placement date and whether it had supply after May 28, 2026.
– A check for legacy/MDR/IVDR identity and change history to avoid duplicate registrations.
– A plan for discontinued products to manage potential post-market obligations.
– Tracking of associated certificates to monitor their public database status.

EU Eudamed Device Registration Deadline: November 2026 Requirements for MDR and IVDR — Pure Global

Share this:

  • Share on Facebook (Opens in new window) Facebook
  • Share on X (Opens in new window) X

Related reading

  • Handwriting Analysis May Serve as a Window Into Early Signs of Cognitive Decline
  • Yale Scientists Identify Immune Protein Linked to Aging That Could Mimic Benefits of Calorie Restriction

Related

CDMO, EU

Search:

World Today News

World Today News is your trusted source for global journalism — breaking headlines, in-depth analysis, and reporting from around the world.

Quick Links

  • Privacy Policy
  • About Us
  • Accessibility statement
  • California Privacy Notice (CCPA/CPRA)
  • Contact
  • Cookie Policy
  • Disclaimer
  • DMCA Policy
  • Do not sell my info
  • EDITORIAL TEAM
  • Terms & Conditions

Browse by Location

  • GB
  • NZ
  • US

Connect With Us

© 2026 World Today News. All rights reserved. Your trusted global news source directory.
For contact, advertising, copyright, issues email: [email protected]

Privacy Policy Terms of Service