British Rail Class 310 EMUs Reached 121 km/h, Served 1965-2002
British Rail Class 310 electric multiple units operated at a maximum speed of 121 km/h (75 mph) after entering service between 1965 and 1967, Wikipedia reported.
Manufactured at the Derby Railway Works in Church Lane, the British Rail First Generation trains were built with bodies based on the Mark 2 coach design, utilizing a semi-integral structure. Each standard four-car formation comprised a second-class control trailer, a second-class trailer, a second-class motor car fitted with a Stone-Faiveley AMBR pantograph alongside a guard’s compartment and luggage space, and a first- and second-class composite control trailer, according to Wikipedia.
| Class | Formation | Numbers | Built |
|---|---|---|---|
| Class 310/0 | 4-car | 310046 – 310095 | 1965 – 1968 |
| Class 310/1 | 3-car | 310101 – 310113 | Converted |
Engineering innovations on the Class 310 included the introduction of disc brakes, enabling an emergency stop from maximum speed within 33 seconds over a distance of approximately 730 meters (800 yards). The units also featured naturally cooled silicon diode rectifiers mounted on beryllium oxide substrates, alongside asbestos sprayed across floors, bodies, and roofs for sound insulation.
Initially painted in rail blue before shifting to British Rail’s standard blue and grey scheme, the trains offered passengers a glass partition behind the driver’s cab for forward and backward views.
Initial deployments covered stopping services between London Euston, Bletchley, Northampton, and Birmingham New Street, alongside West Midlands routes. Wolverton Works carried out major “C1 overhauls” during the mid-1980s, replacing front windows with flat glass, adding gangway connections between motor and trailer cars, and installing public address systems.
Later, units assigned to the London, Tilbury and Southend line received brake enhancement modifications involving plugs added to dummy cylinders and altered proportioning valve sizes to handle frequent stopping patterns.
Subsequent fleet reallocations saw Class 310/0 units replaced out of Euston by Class 317/1 trains, while surviving sets transitioned to LTS Rail—later known as c2c—and Central Trains before being phased out between 1999 and 2002. In 2002, two Class 310/1 units formed a dual-voltage testbed designated as the 960201 “Hitachi Verification Train” or V Train.
Operated by Hitachi to evaluate control systems and equipment ahead of the Class 395 Javelin rollout on High Speed 1, the test train was ultimately dismantled in 2007 at the Ministry of Defence facility in Pig’s Bay, Shoeburyness, Wikipedia reported.