Skip to main content
World Today News
  • Home
  • News
  • World
  • Sport
  • Entertainment
  • Business
  • Health
  • Technology
Menu
  • Home
  • News
  • World
  • Sport
  • Entertainment
  • Business
  • Health
  • Technology
BERN-OST: Walter Wettstein AG Broke Ground on Worb Hall for Heat Pump Assembly

BERN-OST: Walter Wettstein AG Broke Ground on Worb Hall for Heat Pump Assembly

November 23, 2026 Newsroom News

The Walter Wettstein AG will begin assembling large-scale heat pump and refrigeration modules next summer at a new 1,000-square-meter hall in Worb, expanding capacity for industrial decarbonization projects.

Internetportal BERN-OST reported the family-owned firm broke ground on Bollstrasse between the Coop petrol station and the RBS railway crossing, adding a dedicated assembly hall and office wing to its existing Gümligen headquarters. “Space for new possibilities, modern work processes and the future of our company,” the firm says on its website.

Project manager Raymond Burri, a former managing director and current board president, told Internetportal BERN-OST the move responds to rising demand for heat pumps above 500 kilowatts, driven by district heating and industrial clients replacing oil and gas. “It is about decarbonization, away from gas and oil in heat supply,” Burri said. A single campus conversion can save several million liters of heating oil annually.

Prefabrication cuts site time

The company adopted 3D CAD systems several years ago, shifting work from building sites to the shop floor. “This reduces the residence time of our assembly teams on construction sites,” Burri told Internetportal BERN-OST.

Crews of five to six fitters will build modules — some 3.6 meters high — over four to eight weeks each, with two to three teams working in parallel. Every weld is inspected and X-rayed before a 25-tonne overhead crane loads finished skids onto low-bed trailers for transport.

Gümligen base remains

The Gümligen site, home to roughly 150 employees, stays operational. Worb was chosen for its proximity — a short drive for project managers — and public-transport access for apprentices. The firm, founded in 1953 by engineer Walter Wettstein and now co-led by Toni Sigrist and Christine Wettstein, is recruiting additional qualified staff but pledges not to rush hiring, according to Internetportal BERN-OST.

Worb’s industrial profile includes HVAC factories and equipment construction firms established there since the later half of the 20th century, with transportation companies and the timber industry listed as main employers in 2012. The municipality’s infrastructure features the RBS railway — formed by the 1927 merger of the Bern-Worb railroad (1898) and the Worblentalbahn (1913) — providing direct public-transport access at the new Bollstrasse hall site.

Solar-powered heat pump

The new buildings will be heated by a heat pump fed mainly by a photovoltaic array on the workshop roof.

Share this:

  • Share on Facebook (Opens in new window) Facebook
  • Share on X (Opens in new window) X

Worth a look

  • Maine Teen Dies After Canoe Capsizes Near Rockwood; Body Found Sunday
  • Port Workers Could Strike as Union Fails to Extend Contract
  • Trump's Beef Quota Filled About 37% in Month One; Ground Beef Fell 13 Cents (daybreakwire.com)

Related

Search:

World Today News

World Today News is your trusted source for global journalism — breaking headlines, in-depth analysis, and reporting from around the world.

Quick Links

  • Privacy Policy
  • About Us
  • Accessibility statement
  • California Privacy Notice (CCPA/CPRA)
  • Contact
  • Cookie Policy
  • Disclaimer
  • DMCA Policy
  • Do not sell my info
  • EDITORIAL TEAM
  • Terms & Conditions

Browse by Location

  • GB
  • NZ
  • US

Connect With Us

© 2026 World Today News. All rights reserved. Your trusted global news source directory.
For contact, advertising, copyright, issues email: [email protected]

Privacy Policy Terms of Service