Skip to main content
World Today News
  • Home
  • News
  • World
  • Sport
  • Entertainment
  • Business
  • Health
  • Technology
Menu
  • Home
  • News
  • World
  • Sport
  • Entertainment
  • Business
  • Health
  • Technology

Bapeten Approves Site Evaluation for West Bangka Nuclear Plant Project

November 27, 2026 Newsroom News

The Nuclear Energy Regulatory Agency (Bapeten) has approved a site evaluation plan for a proposed nuclear power plant in West Bangka, reaching the decision in four months and 18 working days.

This timeframe sits below the standard six-month service window, according to Bapeten’s director of nuclear installation and materials licensing, Wiryono.

The approval, issued on Friday allows PLN Nusantara Power to proceed with deeper field investigations at the Teluk Menggris site in Menjelang Village, Tempo.co reported. While the regulator accelerated the review, Wiryono stated the process adhered to comprehensive assessment standards. “The site evaluation approval does not constitute a permit to begin physical construction of the PLTN,” he said in a written statement.

PLN Nusantara Power intends to install an advanced-generation Small Modular Reactor (SMR) with a capacity of 250 MWe at the location, according to tech.aseancoverage.com.

The project must still navigate several regulatory hurdles, as current law mandates a multi-stage licensing process for reactors between 10 MWe and 300 MWe.

Bapeten Public Relations Coordinator Abdul Qohhar explained that the current authorization confirms the developer’s Site Evaluation Program and Site Evaluation Management System documents meet safety requirements.

“The feasibility evaluation of the Teluk Menggris site will cover six safety aspects: seismicity, geotechnical and foundation conditions, volcanology, hydrology and meteorology, human-induced events, and radioactive material dispersion,” he said.

The following table outlines the regulatory framework for the project as established by Government Regulation No. 28 of 2025 and Bapeten Regulation No. 5 of 2025:

Licensing Stage Status
Site Evaluation Approval Granted
Site Approval Pending
Design Approval Pending
Construction Permit Pending

Bapeten officials confirmed that the agency conducted direct on-site verification before granting the approval. Updates regarding the oversight of this project are accessible through the PLTN Supervision Corner on the official Bapeten website.

Bapeten, as Indonesia’s nuclear regulatory body, establishes requirements for the security of radioactive sources in facilities, mandating operators to provide response functions, including equipment and emergency response plans, as outlined in BCR No. 6 of 2015. Additionally, Bapeten coordinates interagency response to nuclear security events by issuing BCR No. 1 of 2015, which mandates establishing emergency response organizations, procedures, and training to enhance stakeholder collaboration.

Share this:

  • Share on Facebook (Opens in new window) Facebook
  • Share on X (Opens in new window) X

Related reading

  • Kraków Attack Victim Parents Contact Prosecutors After Girl Survives Shooting
  • OB MainStreet Invites Residents to Shop Small Sat and OBeachy Bingo in Ocean Beach

Related

Search:

World Today News

World Today News is your trusted source for global journalism — breaking headlines, in-depth analysis, and reporting from around the world.

Quick Links

  • Privacy Policy
  • About Us
  • Accessibility statement
  • California Privacy Notice (CCPA/CPRA)
  • Contact
  • Cookie Policy
  • Disclaimer
  • DMCA Policy
  • Do not sell my info
  • EDITORIAL TEAM
  • Terms & Conditions

Browse by Location

  • GB
  • NZ
  • US

Connect With Us

© 2026 World Today News. All rights reserved. Your trusted global news source directory.
For contact, advertising, copyright, issues email: [email protected]

Privacy Policy Terms of Service