Home » News » BRIN Renovation of Steering Council Room Rp 6.1 billion, including Megawati’s Bedroom

BRIN Renovation of Steering Council Room Rp 6.1 billion, including Megawati’s Bedroom

Jakarta

National Research and Innovation Agency (BRIN) plans to renovate the workspace of its Steering Committee with a budget of Rp 6.1 billion. BRIN explained that the renovation was in accordance with existing procedures and regulations.

Head of General Public Communication and Secretarial Bureau BRINDriszal Friyantoni explained that the renovated room was on the 2nd floor. The Rp 6.1 billion budget that was disbursed was the renovation cost for the entire floor.

“It’s true, we will renovate the room on the 2nd floor. I need to inform you, the cost of Rp 6.1 billion is the cost of renovating the entire 2nd floor which was previously the work space of the former Head of BPPT,” said Driszal to detik.comSunday (17/7/2022).

ADVERTISEMENT

SCROLL TO RESUME CONTENT

Driszal explained that the 2nd floor was previously the work room of the Head of the Agency for the Assessment and Application of Technology (BPPT). Later the floor will be used as a workspace for 10 members of the BRIN Steering Committee.

“We will renovate the 2nd floor into workspaces for all 10 Board of Directors, not just for the head of the board of directors himself,” he explained.

One of the rooms on the 2nd floor that will be renovated is the former bedroom of the former Head of BPPT. Later, after the renovation, the bedroom will be used by the Chairperson of the BRIN Steering Committee, Megawati Soekarnoputri.

“Previously, on the 2nd floor there were already bedrooms, bathrooms, dining rooms, living rooms, meeting rooms, and the workspace of the former Head of BPPT,” said Driszal.

Driszal emphasized that this renovation was in accordance with existing regulations. The amount of costs required is also a recommendation from the Ministry of Public Works and Public Housing (PUPR).

“Regarding the amount of costs required, it is a recommendation from the Ministry of PUPR through the Directorate of Building Arrangements,” he said.

“In this implementation, we have followed the applicable regulatory corridors,” added Driszal.

As quoted detik.com from https://lpse.brin.go.id/ on Sunday (17/7/2022), the project has the number 7167760. The name of the project is the BRIN Steering Board’s Workspace Renovation Construction Services.

The location of the renovation is in the office BRIN on Jalan MH Thamrin 8, Central Jakarta. Qualifying participants are small business category with the following conditions:

1. Participants who are business entities must have a business license in the field of SIUJK construction services that is still valid or NIB KBLI 41012 for Office Building Construction that is still valid
2. Have an SBU Business Entity Certificate with Small Business Qualifications, as well as a sub-field of service classification required BG004 Commercial Building Construction Implementation Services or KBLI 41012 Office Building Construction which is still valid
3. Have a deed of company establishment and a deed of company change if there is a change
4. Not included in the Black List, their participation does not cause a conflict of interest of the parties concerned, is not under court supervision, is not bankrupt, is not currently being discontinued and/or who acts for and on behalf of the Business Entity is not currently undergoing criminal sanctions, and the employee management does not have the status of a State Civil Apparatus, unless the person concerned takes leave outside the State’s responsibility
5. Having experience of at least 1 construction work in the last 4 four years, both in government and private sector including subcontracting experience.
6. For the qualification of Small Business which has only been established for less than three years a. Excluded from the provisions of item 8 for procurement with a package value of up to a maximum of IDR 2,500,000,000.00 two billion five hundred million rupiah b. Must have experience in the same field within a period of 1 year, for procurement with a work package value of at least IDR 2,500,000,000.00 two billion five hundred million rupiah up to a maximum of IDR 15,000,000,000.00 fifteen billion rupiah .

Auction registration has been carried out on May 27, 2022 and has been attended by 137 bidders. The auction process is still ongoing.

The room was the plan for the BRIN Board Member. The current composition of the BRIN Board of Directors is:

1. Megawati Soekarnoputri (Chairman);
2. Minister of Finance (Vice Chair);
3. Minister of National Development Planning/Head of National Development Planning Agency (Vice Chair);
4. Sudhamek Agoeng Waspodo Sunyoto (Secretary);
5. Emil Salim (Member);
6. I Great Wenten (Member);
7. Bambang Kesowo (Member);
8. Adi Utarini (Member);
9. Marsudi Wahyu Kisworo (Member);
10. Tri Mumpuni (Member).

See also the video ‘Full of Pros and Cons, PAN Asks its Cadres Not to Use DPR Curtains for IDR 43.5 Billion’:

[Gambas:Video 20detik]

(it’s/imk)

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.